Ongoing design development of the surface infrastructure and landscaping to support the London to Birmingham route.

Clients

Fereday Pollard developed architectural and public realm designs as part of the Arcadis multi disciplinary engineering team based in Birmingham in support of the Kier and Eiffage contracting JV for their sections S1 and S2 tender. With two principle sites being principally developed – the first at Euston as the routes comes out of the central London tunnel section and second in Westgate as the route starts its journey north – we worked through the infrastructure designs in considerable detail to ensure that the contracting JV could accurately price and programme the works for the tender.

Since then, we have been contracted to the Skanska Costain Strabag contracting JV via the Fourways engineering lead to provide architectural and landscape support and ensure that the developed schemes are fully integrated.