As part of the Kidbrooke Village development we have designed an entirely new station supporting the wider masterplan by Lifschutz Davidson Sandilands with Berkeley Homes, Network Rail and Southeastern Railway.
Responsible for developing the design through each GRIP stage, working with NR, the client team, stakeholders, planners and masterplan architects LDS, we ensured a suitable design vision, materiality and quality was maintained through to technical design, coordination, construction and delivery, including managing interfaces with the new residential developments adjacent.
The team also developed an interim station design, allowing the demolition of the existing station to facilitate construction of the new with minimum disruption to passengers as well as the station Change and Approvals processes.