New operational surface structures for the National Grid's Phase 1 London re-cabling programme providing access, evacuation and functional operation for the subterranean tunnel
COMPLETED
Phase 1 complete
Clients
Multi discipline design team with Mott MacDonald and Halcrow (a CH2M Hill Company)
Design of 12 head houses across London as part of the National Grid London Cable Replacement Project
Sound understanding of the technical requirements including the ventilation and operational systems
Rational solutions which respond to the building function and National Grid requirements
Range of locations from semi industrial sites to tight urban locations, with aesthetic and scale responding to their context
Working with Revit Architecture, developed a shared model with all the other design disciplines